Abstract:
The suitability of surface drainage system, the hydrological parameters needed for design of surface drainage system, updating of SCS curve number and the SCS method for computation of design discharge during successive rainy days have been reviewed in this paper. A method for computation of peak discharge for which the surface drainage channel should be designed has been suggested.