DSpace Repository

257-Long-Term Integrated Water Management in the German Elbe River Basin.

Show simple item record

dc.contributor.author Becker, Alfred
dc.date.accessioned 2020-10-28T20:27:03Z
dc.date.available 2020-10-28T20:27:03Z
dc.date.issued 2009
dc.identifier.uri http://117.252.14.250:8080/jspui/handle/123456789/5203
dc.description.abstract A general Integration Methodology and Approach management in large river basins. Main steps of the approach are: 1. Problem description and goals definition 2. Conceptualisation 3. Scenario definition and alternative management design 4. Simulation and estimation of effects/impacts 5. Evaluation 6. Comparison and negotiation. (IMA) has been developed to investigate multipurpose Stakeholders and decision makers are involved in all steps of the approach. The approach is now applied in the whole Elbe river basin covering the Czech Republic and Germany (148000 km2, about 1/3 Czech, 2/3 Germany). Results will be presented next year. To illustrate how the approach works selected results from an earlier study in a German tributary river basin, the Spree-Havel basin (24000 km2), in particular the Spree river basin upstream Berlin (6171 km2), will be presented here. In this river basin, the following critical conditions are given: • limited water availability, in particular in the vegetation season (summer) • increasing water demand in urban areas and industrial regions • insufficient nature protection in many wetlands • irregular winter floods • complex water management conditions. Basis for the detailed analysis has been a complex water balance and management model containing 190 users (industries, municipalities, wetlands, etc.), 122 balance points, 14 reservoirs, 50 dynamical elements (modules) representing special elements and functions in the basin (e.g. water transfers, open pit mines) and about 200 reference points where results can be registered to evaluate the investigated scenarios. In the end, a control strategy for the reservoirs, water transfers and water uses is selected, that fulfils best over time the demands throughout the basin. As an example, it should be mentioned that a sufficient water supply for the Berlin area could only be achieved by constructing a new reservoir in the upper Spree basin and by operating the system on a continuous basis considering the water demands of all users in the basin. A general conclusions from the study is that in dry periods (summers) special measures are required to provide enough water for the surface water system of Berlin, to the wetlands of the Spreewald and in the upper Spree for the refilling of the open pit mines to act against their acidification. en_US
dc.language.iso en en_US
dc.publisher Allied Publishers Pvt. Limited, New Delhi en_US
dc.subject Water Resources Management en_US
dc.subject German Elbe River Basin en_US
dc.title 257-Long-Term Integrated Water Management in the German Elbe River Basin. en_US
dc.type Technical Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account