DSpace Repository

83-Real-Time Flood Forecasting Using Muskingum Stage—Hydrograph Routing Method.

Show simple item record

dc.contributor.author Perumal, M.
dc.contributor.author Moramarco, T.
dc.contributor.author Barbetta, S.
dc.contributor.author Melone, F.
dc.contributor.author Sahoo, Bhabagrahi
dc.date.accessioned 2020-09-15T20:28:40Z
dc.date.available 2020-09-15T20:28:40Z
dc.date.issued 2009
dc.identifier.uri http://117.252.14.250:8080/jspui/handle/123456789/4837
dc.description.abstract The application of a variable parameter Muskingum stage—hydrograph routing. method for real—time flood forecasting at a river gauging site is demonstrated in this study. The estimation of forecast error is made using a two— parameter linear autoregressive model with its parameters updated at every time interval of 30 minutes at which the stage observations are made. This hydrometric data—based forecast model is applied for forecasting floods at the downstream end of a 15 km reach of the Tiber River in Central Italy. The study reveals that reliable forecast of flood estimate can be made for different lead times subject to a maximum lead time nearly equal to the travel time of the flood wave within the selected routing reach. en_US
dc.language.iso en en_US
dc.publisher Allied Publishers Pvt. Limited, New Delhi en_US
dc.subject Flood en_US
dc.subject Draught en_US
dc.title 83-Real-Time Flood Forecasting Using Muskingum Stage—Hydrograph Routing Method. en_US
dc.type Other en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account