Abstract:
The estimation of floods for small and medium catchments poses a problem due to impractiability of collecting site specific long term data to overcome this Central Water Commission has therefore been using a method which uses regional estimate of storm of the. desired frequency convoluted with .the representive unit hydrograph. To obtain design flood hydrograph, this paper outlines the methodology and brings out the limitations.