DSpace Repository

24-Reservoir operating rule for Narmadasagar dynamic programming approach.

Show simple item record

dc.contributor.author Venugopal, K.
dc.contributor.author Sivagnavelu, S.
dc.contributor.author Raghavendran, R.
dc.contributor.author Sakthivadivel, R.
dc.date.accessioned 2019-08-02T11:05:29Z
dc.date.available 2019-08-02T11:05:29Z
dc.date.issued 1987
dc.identifier.uri http://117.252.14.250:8080/jspui/handle/123456789/3281
dc.description.abstract This work relates to application of dynamic programming model to Narmadasagar reservoir across river Narmada in the state of Madhya Pradesh . The model is formulated to determine the operating rule for maximizing power after meeting irrigation. The irrigation demand pertains to the development scenario 1991-92 while the full development of irrigation utilisation takes place only during 2023-24 (final scenario).The inflow into Narmadasagar for the historic record of 32 years, for the 1991-92 scenario of development is obtained from a simulation model (I.I.M.,Bangalore, June,1985). Eventhough, the reservoir is to be built to a height of 262.13 m (12212 Mm ) with a live storage of 10855 Mm , the model brings out the performance for FRLs namely256.0 m , 257.6 m, 259.0 m , 260.67 m and 262.13 m. The power generation for installed capacities namely 875 MW, 1000 MW, 1125 MW and 1250 MW are also discussed. In Dynamic programming problems, the accuracy of the results depends on the fineness of the state variables. As the number of states increase, the computer time increases and vice versa.The effect of variation of number of states on the performance and on the CPU time required are analysed. Number of states considered are 9, 15, 20, 25 and 40. The CPU time needed for a run with 40 states is about 20 times that of a run with 9 states. Benefit from irrigation is taken as 8.8 paise per cubic metre of water and the power benefit at bus bar is taken as 30 paise/KW hr. Efficiency of power generation is taken as 85 percent. en_US
dc.language.iso en en_US
dc.publisher National Institute of Hydrology en_US
dc.subject Dynamic programme en_US
dc.subject Narmadasagar reservoir en_US
dc.subject Narmada river en_US
dc.subject Madhya Pradesh en_US
dc.subject Reservoir operating rule en_US
dc.title 24-Reservoir operating rule for Narmadasagar dynamic programming approach. en_US
dc.type Technical Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account