DSpace Repository

59-Surface water & ground water quality monitoring for restoration of urban lakes in Grater Hyderabad

Show simple item record

dc.contributor.author Rao, V. V. S. Gurunadha
dc.contributor.author Prakash, B. A.
dc.contributor.author Ramesh, M.
dc.contributor.author Kumar, K. Mahesh
dc.date.accessioned 2019-07-04T10:07:33Z
dc.date.available 2019-07-04T10:07:33Z
dc.date.issued 2008
dc.identifier.uri http://117.252.14.250:8080/jspui/handle/123456789/3033
dc.description.abstract Hyderabad Urban Development Authority has taken up restoration of urban lakes around Hyderabad city under Green Hyderabad Environment Program. Restoration of Mir Alam Tank, Durgamcheruvu, Patel cheruvu, Pedda Cheruvu and Nallacheruvu lakes have been taken up under the second phase. There are of six lakes viz., RKPuramcheruvu, Nadimicheruvu (Safilguda), Bandacheruvu Patelcheruvu, Peddacheruvu, Nallacheruvu, in North East Musi Basin covering 38 sq km. Bimonthly monitoring of lake water quality for BOD, COD, Total Nitrogen, Total phosphorous has been carried out for two hydrological cycles during October 2002- October 2004 in all the five lakes at inlet channels and outlets. The sediments in the lake have been also assessed for nutrient status. The nutrient parameters have been used to assess eutrophic condition through computation of Trophic Status Index, which has indicated that all the above lakes under study are under hypereutrophic condition. The hydrogeological, geophysical, water quality and groundwater data base collected in two watersheds covering 4 lakes has been used to construct groundwater flow and mass transport models. The interaction of lake-water with groundwater has been computed for assessing the lake water budget combining with inflow and outflow measurements on streams entering and leaving the lakes. Individual lake water budget has been used for design of appropriate capacity of Sewage Treatment Plants (STPs) on the inlet channels of the lakes for maintaining Full Tank Level (FTL) in each lake. STPs are designed for tertiary treatment i.e. removal of nutrient load viz., Phosphates and Nitrates. Phosphates are removed through addition of Alum to the influent stream to the STPs whereas Nitrates reduction is achieved by sending the treated wastewater from the STP through a wetland before entering the lake. STP capacity ranging from 2 —10 MLD has been recommended depending on lake water budget of individual lake and considering surrounding urbanization. Sediment nutrient data has helped for deciding the need for dredging of lake bed for removal of phosphates. en_US
dc.language.iso en en_US
dc.publisher National Institute of Hydrology en_US
dc.subject Surface Water en_US
dc.subject Groundwater en_US
dc.subject Urban lakes en_US
dc.subject Grater Hyderabad en_US
dc.title 59-Surface water & ground water quality monitoring for restoration of urban lakes in Grater Hyderabad en_US
dc.type Technical Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account