Please use this identifier to cite or link to this item: http://117.252.14.250:8080/jspui/handle/123456789/4837
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPerumal, M.-
dc.contributor.authorMoramarco, T.-
dc.contributor.authorBarbetta, S.-
dc.contributor.authorMelone, F.-
dc.contributor.authorSahoo, Bhabagrahi-
dc.date.accessioned2020-09-15T20:28:40Z-
dc.date.available2020-09-15T20:28:40Z-
dc.date.issued2009-
dc.identifier.urihttp://117.252.14.250:8080/jspui/handle/123456789/4837-
dc.description.abstractThe application of a variable parameter Muskingum stage—hydrograph routing. method for real—time flood forecasting at a river gauging site is demonstrated in this study. The estimation of forecast error is made using a two— parameter linear autoregressive model with its parameters updated at every time interval of 30 minutes at which the stage observations are made. This hydrometric data—based forecast model is applied for forecasting floods at the downstream end of a 15 km reach of the Tiber River in Central Italy. The study reveals that reliable forecast of flood estimate can be made for different lead times subject to a maximum lead time nearly equal to the travel time of the flood wave within the selected routing reach.en_US
dc.language.isoenen_US
dc.publisherAllied Publishers Pvt. Limited, New Delhien_US
dc.subjectFlooden_US
dc.subjectDraughten_US
dc.title83-Real-Time Flood Forecasting Using Muskingum Stage—Hydrograph Routing Method.en_US
dc.typeOtheren_US
Appears in Collections:Proceedings of the International Conference on Water, Environment, Energy and Society (WEES-2009), 12-16 January 2009 at New Delhi, India, Vol.-2

Files in This Item:
File Description SizeFormat 
83-Real-Time Flood Forecasting Using Muskingum Stage—Hydrograph Routing Method..pdf2.37 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.