Please use this identifier to cite or link to this item: http://117.252.14.250:8080/jspui/handle/123456789/4363
Title: 25.-Flood forecasting and warning system for back water affected areas of Sardar Sarovar Projects
Authors: Bhandari, N. K.
Mahana, A. K.
Keywords: Flood forecasting
Sardar Sarovar Projects
Issue Date: 2000
Publisher: National Institute of Hydrology
Abstract: Sardar Sarovar is an interstate, multipurpose termin-.1 project on river Narmada. The top R.L. of dam is 146.50 m but some blocks of main dam are still under construction and existing at a height of 85.0 m. The work of dam started.long back i.e. in the year 1980 but due to various problems specially not able to complete Resettlement and Rehabilitation, the progress on main dam is lagging and may take some more years to construct the dam to full height. Due to partial construction of Dam, lake is formed and u/s areas are affected due to backwater of SSP during floods. Still some villages situated above 90 m R.L. in the submergence area are not shifted, it is therefore necessary to issue flood forecast warnings for these villages. The paper discusses the problem involved, methodology for back water level forecasting, present status of the system and suggestions for improvement.
URI: http://117.252.14.250:8080/jspui/handle/123456789/4363
Appears in Collections:Tenth National Symposium on Hydrology with Focal Theme on Urban Hydrology, 18-19 July 2000 New Delhi



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.