Please use this identifier to cite or link to this item:
http://117.252.14.250:8080/jspui/handle/123456789/359
Title: | UM-6 : Preparation of Working Table |
Authors: | Seethapathi, P. V. Dhason, S. R. B. |
Keywords: | Working table-Preparation Multipurpose water management policy Model PISIM-I |
Issue Date: | 1984 |
Publisher: | National Institute of Hydrology |
Series/Report no.: | ;UM-6 |
Abstract: | A computer model is presented for quantifying the impacts of multipurpose water management policy. The model is designated for analysis of water availabilities throughout a river basin over extended time periods. It is capable of simulating ten daily storage, flow and diversion of water in a complex river basin system. The model PISIM-I is synthesized from previously existing models. An advantage of this model is its optimizing capability with respect to reservoir operating rules. Also PISIM-I is able to simulate institutional dictates governing water allocation, such as water rights priorities. For the first time, reservoir factor is introduced to the reservoir operation model. |
URI: | http://117.252.14.250:8080/xmlui/handle/123456789/359 |
Appears in Collections: | User's Manuals |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.