Please use this identifier to cite or link to this item: http://117.252.14.250:8080/jspui/handle/123456789/3390
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChowdhary, Hemant-
dc.contributor.authorSingh, R. D.-
dc.contributor.authorSingh, Pratap-
dc.date.accessioned2019-08-23T05:53:38Z-
dc.date.available2019-08-23T05:53:38Z-
dc.date.issued1997-
dc.identifier.citationNational Institute of Hydrologyen_US
dc.identifier.urihttp://117.252.14.250:8080/jspui/handle/123456789/3390-
dc.description.abstractStreamflow is a very important phase of the hydrological cycle as far as its utilisation by mankind is concerned. At the same time this phase also creates disastrous situations for the surrounding areas. For better design, management and operation of various conservational and protectional projects an idea about the amount of water flowing through a particular section of stream is very essential. Stream flow measurement is thus a very important hydrological investigation activity. In this chapter the present status of stream gauging in India is discussed. The factors which have effected the use of certain methodologies and equipment at different stream gauging sites have been presented. A few problems which are faced while using these equipment have been brought into the state of stream gauging in India.en_US
dc.language.isoenen_US
dc.publisherAllied publisher limited, New Delhien_US
dc.subjectStream gaugingen_US
dc.title21-Stream gauging in India - Practices and problemsen_US
dc.typeTechnical Reporten_US
Appears in Collections:National workshop on Advances in hydrological instrumentation

Files in This Item:
File Description SizeFormat 
21-Stream gauging in India - Practices and problems.pdf2.48 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.